Once a year, publicly traded companies issue a comprehensive report of their business, called a 10-K. A component mandated in the 10-K is the ‘Risk Factors’ section, where companies disclose any major potential risks that they may face. This dashboard highlights all major changes and additions in new 10K reports, allowing investors to quickly identify new potential risks and opportunities.

Risk Factors - NG

-New additions in green
-Changes in blue
-Hover to see similar sentence in last filing

Item 1A.

Risk Factors

You should carefully consider the following risk factors in addition to the other information included in this Annual Report on Form 10-K. Each of these risk factors could adversely affect our business, operating results and financial condition, as well as adversely affect the value of an investment in our common shares. The risks described below are not the only ones facing the Company. Additional risks that we are not presently aware of, or that we currently believe are immaterial, may also adversely affect our business, operating results and financial condition. We cannot assure you that we will successfully address these risks and caution that other unknown risks may exist or may arise that may affect our business.

An investment in our securities is speculative and involves a high degree of risk due to the nature of our business and the present stage of exploration and development of our mineral properties. The following risk factors, as well as risks not currently known to us, could materially adversely affect our future business, operations and financial condition and could cause them to differ materially from the estimates described in the forward-looking statements relating to us.

Risks Related to Our Business

We have no history of commercially producing precious metals from our mineral exploration properties and there can be no assurance that we will successfully establish mining operations or profitably produce precious metals.

The Donlin Gold project is not in production or currently under construction, and we have no ongoing mining operations or revenue from mining operations. Mineral exploration and development has a high degree of risk and few properties that are explored are ultimately developed into producing mines. The future development of the Donlin Gold project will require obtaining permits and financing and the construction and operation of mines, processing plants and related infrastructure. As a result, we are subject to all of the risks associated with establishing new mining operations and business enterprises, including:

the need to obtain necessary environmental and other governmental approvals and permits, and the timing and conditions of those approvals and permits;

the availability and cost of funds to finance construction and development activities;

the timing and cost, which can be considerable, of the construction of mining and processing facilities as well as related infrastructure;

potential opposition from NGOs, environmental groups or local groups which may delay or prevent development activities;

potential increases in construction and operating costs due to changes in the cost of labor, fuel, power, materials and supplies, services, and foreign exchange rates;

the availability and cost of skilled labor and mining equipment; and

the availability and cost of appropriate smelting and/or refining arrangements.

The costs, timing and complexities of mine construction and development are increased by the remote location of our mineral properties, with additional challenges related thereto, including access, water and power supply, and other support infrastructure. Cost estimates may increase significantly as more detailed engineering work and studies are completed on a project. New mining operations commonly experience unexpected costs, problems and delays during development, construction, and mine start-up. In addition, delays in the commencement of mineral production often occur. Accordingly, there are no assurances that our activities will result in profitable mining operations, or that we will successfully establish mining operations, or profitably produce precious metals at the Donlin Gold project.

In addition, there is no assurance that our mineral exploration activities will result in any discoveries of new ore bodies. If further mineralization is discovered there is also no assurance that the mineralized material would be economical for commercial production. Discovery of mineral deposits is dependent upon a number of factors and significantly influenced by the technical skill of the exploration personnel involved. The commercial viability of a mineral deposit is also dependent upon a number of factors which are beyond our control, including the attributes of the deposit, commodity prices, government policies and regulation, and environmental protection requirements.

We are dependent on a third party in the exploration and development of our Donlin Gold project.

Our success with respect to the Donlin Gold project depends on the cooperation of a third party with whom we have an agreement; we hold a 50% interest and the remaining 50% interest is held by the third party that is not under our control or direction. We are dependent on the third party for the progress and development of the Donlin Gold project. The third party may also have different priorities which could impact the timing and cost of development of the Donlin Gold project. The third party may also be in default of its agreement with us, without our knowledge, which may put the mineral property and related assets at risk. The existence or occurrence of one or more of the following circumstances and events could have a material adverse impact on our ability to achieve our business plan, profitability, or the viability of our interests held with the third party, which could have a material adverse impact on our business, future cash flows, earnings, results of operations and financial condition: (i) disagreement with the third party on how to develop and operate the Donlin Gold project efficiently; (ii) inability to exert influence over certain strategic decisions made in respect of the jointly-held Donlin Gold project; (iii) inability of the third party to meet its obligations to the joint business or other parties; and (iv) litigation with the third party regarding joint business matters.

13

NOVAGOLD RESOURCES INC.

We may choose to proceed with a feasibility study for the Donlin Gold project without the participation of the co-owner, which would require significant management time and additional capital resources.

Although proposed by NOVAGOLD, currently the owners have not agreed to commence an updated feasibility study. The Company may choose to proceed with a feasibility study for the Donlin Gold project on its own without the participation of the co-owner, although the Company has not yet made a determination to do so. Embarking on a feasibility study is an endeavor requiring significant funding and staffing. We expect a feasibility study would take approximately two years to complete once commenced and would require significant management time and attention. In addition, if the Company ultimately decides to proceed with its own feasibility study for the Donlin Gold project, the Company will be required to raise additional capital through means such as equity and/or debt financing to successfully complete the feasibility study. There can be no assurance that the Company could raise the required capital on terms favorable to it, or at all. There can be no assurance that the market price of gold will remain at current levels or that such prices will improve.

We have a history of net losses and expect losses to continue for the foreseeable future.

The Donlin Gold project has not advanced to the commercial production stage and we have no history of earnings or cash flow from operations. We expect to continue to incur net losses unless and until such time the Donlin Gold project commences commercial production and generates sufficient revenues to fund continuing operations. The development of our mineral properties to achieve production will require the commitment of substantial financial resources. The amount and timing of expenditures will depend on a number of factors, including the progress of ongoing exploration and development, the results of consultants’ analyses and recommendations, the rate at which operating losses are incurred, the process of obtaining required government permits and approvals, the availability and cost of financing, the participation of our partners, and the execution of any sale or joint venture agreements with strategic partners. These factors, and others, are beyond our control. There is no assurance that we will be profitable in the future.

We have a limited property portfolio.

At present, our only material mineral property is the interest that we hold in the Donlin Gold project. Unless we acquire or develop additional mineral properties, we will be solely dependent upon this property. If no additional mineral properties are acquired by us, any adverse development affecting our operations and further development at the Donlin Gold project may have a material adverse effect on our financial condition and results of operations.

Our ability to continue the exploration, permitting, development, and construction of the Donlin Gold project, and to continue as a going concern, will depend in part on our ability to obtain suitable financing.

We have limited financial resources. We will need external financing to develop and construct the Donlin Gold project. According to the S-K 1300 Report (as defined below), the total initial capital cost estimate for the Donlin Gold project is approximately $7,402 million which includes the costs related to the natural gas pipeline (100% basis). According to the S-K 1300 Report, the total initial capital cost estimate for the Donlin Gold project is approximately $7,402 million which includes the costs related to the natural gas pipeline (100% basis). These cost estimates may change materially as our studies are updated. Our failure to obtain sufficient financing could result in the delay or indefinite postponement of exploration, development, construction, or production at the Donlin Gold project. The cost and terms of such financing may significantly reduce the expected benefits from development of the Donlin Gold project and/or render such development uneconomic. There can be no assurance that additional capital or other types of financing will be available when needed or that, if available, the terms of such financing will be favorable. Our failure to obtain financing could have a material adverse effect on our growth strategy and results of operations and financial condition.

We intend to fund our near-term business plan from working capital. Longer term, our ability to continue future exploration, permitting, development, and construction activities, if any, will depend in part on our ability to obtain suitable equity, debt, or other forms of financing. In the future, our ability to continue our exploration, permitting, development, and construction activities, if any, will depend in part on our ability to obtain suitable financing. If we raise additional funding by issuing additional equity securities or other securities that are convertible into equity securities, such financing may substantially dilute the interest of existing or future shareholders. Sales or issuances of a substantial number of securities, or the perception that such sales could occur, may adversely affect the prevailing market price for our common shares. With any additional sale or issuance of equity securities, investors will suffer dilution of their voting power and may experience dilution in earnings per share.

14

NOVAGOLD RESOURCES INC.

There can be no assurance that we will commence production at the Donlin Gold project or generate sufficient revenues to meet our obligations as they become due or obtain necessary financing on acceptable terms, if at all. Our failure to meet our ongoing obligations on a timely basis could result in the loss or substantial dilution of our interests (as existing or as proposed to be acquired) in the Donlin Gold project. In addition, should we incur significant losses in future periods, we may be unable to continue as a going concern, and realization of assets and settlement of liabilities in other than the normal course of business may be at amounts materially different than our estimates.

Actual capital costs, operating costs, production and economic returns may differ significantly from those we have anticipated and there are no assurances that any future development activities will result in profitable mining operations.

The capital costs to take the Donlin Gold project into production may be significantly higher than anticipated. As a result of the content updates included in the 2021 Technical Report (as defined below) and S-K 1300 Report, the total initial capital cost estimate for the Donlin Gold project is $7,402 million. As a result of the content updates included in the 2021 Technical Report (as defined below) and S-K 1300 Report (as defined below), the total initial capital cost estimate for the Donlin Gold project is $7,402 million. Likewise, the total sustaining capital estimate is $1,723 million.

We do not have an operating history upon which we can base estimates of future operating costs. Decisions about the development of the Donlin Gold project will ultimately be based upon feasibility studies. Feasibility studies derive estimates of cash operating costs based upon, among other things:

anticipated tonnage, grades and metallurgical characteristics of the ore to be mined and processed;

anticipated recovery rates of gold and other precious metals from the ore;

cash operating costs of comparable facilities and equipment; and

anticipated climatic conditions.

Capital costs, operating costs, production and economic returns, and other estimates contained in studies or estimates prepared by or for us may differ significantly from those anticipated by our current or future studies and estimates, and there can be no assurance that the initial capital costs incurred to construct, and the sustaining capital and operating costs incurred in operating the Donlin Gold project will not be higher than currently anticipated.

Changes in the market price of gold, which in the past has fluctuated widely, affect our financial condition.

Our profitability and long-term viability will depend, in large part, upon the market price of gold that may be produced from our Donlin Gold project. The market price of gold is volatile and is impacted by numerous factors beyond our control, including:

global or regional consumption patterns;

expectations with respect to the rate of inflation;

the relative strength of the U.S. dollar and certain other currencies;

interest rates;

global or regional political or economic conditions, including interest rates and currency values;

supply and demand for jewelry and industrial products containing gold; and

sales or purchases by central banks and other holders, speculators, and producers of gold in response to any of the above factors.

We cannot predict the effect of these factors on the price of gold. A decrease in the market price of gold could affect our ability to finance the development of the Donlin Gold project, which would have a material adverse effect on our financial condition and results of operations. There can be no assurance that the market price of gold will remain at current levels or that such prices will improve. An increase in worldwide supply, and consequent downward pressure on prices, may result over the longer term from increased production from the development of new or expansion of existing mines. There is no assurance that if commercial quantities of gold are discovered, that a profitable market may exist or continue to exist for a production decision to be made or for the ultimate sale of gold.

General economic conditions may adversely affect our growth, future profitability and ability to finance.

Some key impacts which can contribute to financial market turmoil potentially impacting the mining industry include contraction in credit markets resulting in a widening of credit risk, imposition of trade tariffs among various countries, devaluations, high volatility in global equity, commodity, foreign exchange and precious metal markets and a lack of market liquidity. The prices of gold and gold mining company equities have experienced significant volatility over the past few years.

15

NOVAGOLD RESOURCES INC.

A decrease in the price of gold or tightening of credit in the financial markets or other economic conditions, including but not limited to, consumer spending, employment rates, business conditions, inflation, fuel and energy costs, consumer debt levels, lack of available credit, the state of the financial markets, interest rates and tax rates, may adversely affect our ability to finance development and construction of the Donlin Gold project. Specifically:

global economic conditions could make other investment sectors more attractive, thereby affecting the cost and availability of financing to us and our ability to achieve our business plan;

the imposition of protectionist or retaliatory trade tariffs by countries may impact our ability to import materials needed to construct our projects or conduct our operations, or to export our products, at prices that are economically feasible for our operations, or at all;

the volatility of metal prices would impact the economic viability of the Donlin Gold project and any future revenues, profits, losses and cash flow;

negative economic pressures could adversely impact demand for future production from the Donlin Gold project;

construction related costs could increase and adversely affect the economics of the Donlin Gold project;

volatile energy, commodity and consumables prices and currency exchange rates would impact our future production costs; and

the devaluation and volatility of global stock markets would impact the valuation of our equity and other securities.

Opposition to our operations from local stakeholders or NGOs could have a material adverse effect on us.

There is ongoing public concern relating to the effect of mining production on its surroundings, communities, and environment. Local communities and NGOs, some of which oppose resource development, are often vocal critics of the mining industry. Local communities and non-governmental organizations (NGOs), some of which oppose resource development, are often vocal critics of the mining industry. While we seek to operate in a socially responsible manner, opposition to extractive industries or our operations specifically or adverse publicity generated by local communities or NGOs related to extractive industries, or our operations specifically, could have an adverse effect on our reputation and financial condition or our relationships with the communities in which we operate. As a result of such opposition or adverse publicity, we may be unable to obtain permits necessary for our operations or to continue our operations as planned or at all. See “Recent Developments” above.

We require various permits to conduct our current and anticipated future operations, and delays or a failure to obtain such permits, or a failure to comply with the terms of any such permits that we have obtained, could have a material adverse impact on us.

Our current and anticipated future operations, including further exploration and development activities and commencement of production on the Donlin Gold project, require permits from various United States federal, state, and local governmental authorities. There can be no assurance that all permits that we require for the construction of mining facilities and to conduct mining operations will be obtainable on reasonable terms, or at all. Delays or a failure to obtain such permits, or a failure to comply with the terms of any such permits that we have obtained, could have a material adverse impact on us.

The duration and success of efforts to obtain and renew permits are contingent upon many variables not within our control. Shortage of qualified and experienced personnel in the various levels of government could result in delays or inefficiencies. Backlog within the permitting agencies could affect the permitting timeline of the various projects. Other factors that could affect the permitting timeline include (i) the number of other large-scale projects currently in a more advanced stage of development which could slow down the review process and (ii) significant public response regarding a specific project. Also, it can be difficult to assess what specific permitting requirements will ultimately apply to the Donlin Gold project. As well, it can be difficult to assess what specific permitting requirements will ultimately apply to the Donlin Gold project.

The quantities for our mineral resources and mineral reserves are estimates based on interpretation and assumptions and may yield less mineral production under actual conditions than is currently estimated.

Unless otherwise indicated, mineralization quantities presented in this Annual Report on Form 10-K and in our other filings with securities regulatory authorities, press releases and other public statements that may be made from time to time are based upon estimates made by our personnel and independent professionals. In addition, these estimates are imprecise and depend upon geologic interpretation and statistical inferences drawn from drilling and sampling analysis, which may prove to be unreliable. There can be no assurance that:

these estimates will be accurate;

mineral reserve, mineral resource or other mineralization figures will be accurate; or

this mineralization could be mined, processed, or sold profitably.

16

NOVAGOLD RESOURCES INC.

Because we have not commenced commercial production at the Donlin Gold project, mineralization estimates may require adjustments, including potential downward revisions based upon further exploration or development work, actual production experience, or changes in the price of gold. In addition, the grade of ore ultimately mined, if any, may differ from that indicated by drilling results. There can be no assurance that the percentage of minerals recovered in small-scale tests will be duplicated in large-scale tests under on-site conditions or at production scale.

Mineral resource estimates for mineral properties that have not commenced production are based, in many instances, on limited and widely spaced drill hole information, which is not necessarily indicative of the conditions between and around drill holes. Accordingly, such mineral resource estimates may require revision as more drilling information becomes available or as actual production experience is gained. No assurance can be given that any part or all of our mineral resources constitute or will be converted into reserves.

The estimating of mineral reserves and mineral resources is a subjective process that relies on the judgment and experience of the persons preparing the estimates. The process relies on the quantity and quality of available data and is based on knowledge, mining experience, analysis of drilling results and industry practices. Valid estimates made at a given time may significantly change when new information becomes available. By their nature, mineral resource and reserve estimates are imprecise and depend, to a certain extent, upon analysis of drilling results and statistical inferences that may ultimately prove to be inaccurate. There can be no assurances that actual results will meet the estimates contained in studies.

Estimated mineral reserves or mineral resources may have to be recalculated based on changes in metal prices, further exploration or development activity, or actual production experience. In addition, if production costs increase, recovery rates decrease, if applicable laws and regulations are adversely changed, there is no assurance that the anticipated level of recovery will be realized or that mineral reserves or mineral resources as currently reported can be mined or processed profitably. This could materially and adversely affect estimates of the volume or grade of mineralization, estimated recovery rates or other important factors that influence mineral reserve or mineral resource estimates. The extent to which mineral resources may ultimately be reclassified as mineral reserves is dependent upon the demonstration of their profitable recovery. Any material changes in mineral resource estimates and grades of mineralization will affect the economic viability of placing a mineral property into production and a mineral property’s return on capital. We cannot provide assurance that mineralization identified at the Donlin Gold project can or will be mined or processed profitably.

The mineral resource and mineral reserve estimates contained in this Annual Report on Form 10-K have been determined and valued based on assumed future prices, cut-off grades and operating costs that may prove to be inaccurate. Extended declines in market prices for gold may render portions of our mineralization uneconomic and result in reduced reported mineralization. Any material reductions in estimates of mineralization, or of our ability to extract this mineralization, could have a material adverse effect on our ability to implement our business strategy, the results of operations or our financial condition.

We have established the presence of proven and probable mineral reserves at the Donlin Gold project in accordance with the disclosure definition and standards contained in S-K 1300 and in NI 43-101. There can be no assurance that additional mineral resources will ultimately be reclassified as mineral reserves. The failure to increase mineral reserves could restrict our ability to successfully implement our strategies for long-term growth and could impact future cash flows, earnings, results of operation and financial condition. The failure to establish proven and probable mineral reserves could restrict our ability to successfully implement our strategies for long-term growth and could impact future cash flows, earnings, results of operation and financial condition.

Lack of infrastructure could delay or prevent us from developing the Donlin Gold project.

Completion of the development of the Donlin Gold project is subject to various requirements, including the availability and timing of acceptable arrangements for power, water, transportation, access, and facilities. The lack of availability on acceptable terms or the delay in the availability of any one or more of these items could prevent or delay development of the project. There can be no assurance that adequate infrastructure, including access and power supply, will be built, that it will be built in a timely manner or that the cost of such infrastructure will be reasonable or that it will be sufficient to satisfy the requirements of the project. If adequate infrastructure is not available in a timely manner, there can be no assurance that:

the development of the Donlin Gold project will be commenced or completed on a timely basis, if at all;

the resulting operations will achieve the anticipated production volume; or

the construction costs and ongoing operating costs associated with the development of the Donlin Gold project will not be higher than anticipated.

17

NOVAGOLD RESOURCES INC.

Access to the Donlin Gold project is limited and there is no infrastructure that serves the project area. An approximately 507-kilometer natural gas pipeline is needed to supply fuel to the proposed on-site generating plant to provide power for the Donlin Gold project. The proposed pipeline would traverse generally undeveloped areas in Alaska that are difficult to access. Transportation of most of the supplies needed to construct and operate the Donlin Gold project would be accomplished by barging materials on the Kuskokwim River during the annual shipping season which typically occurs from late April to mid-October. Two ports would be needed on the Kuskokwim River, the first located in Bethel, Alaska, where ocean barges would transition materials to river barges; and the second located approximately 320 kilometers upriver from Bethel. A 48-kilometer access road from the upriver port to the project site is needed to deliver the materials. Additionally, a 1,500-meter airstrip would be built to provide year-round access to the project. Terrain, geologic conditions, ground conditions, steep slopes, river levels, ice breakup, weather, climate change impacts and other natural conditions that are beyond our control along the pipeline and transportation routes present design, permitting, construction, and operational challenges for the project. Cost and schedule estimates may increase significantly as more detailed engineering work, geotechnical and geological studies are completed.

Title and other rights to our mineral properties are subject to agreements with other parties.

The subsurface mineral and surface rights at the Donlin Gold project are owned by Calista Corporation (“Calista”) and The Kuskokwim Corporation (TKC), respectively, two Native corporations. Donlin Gold operates on these lands pursuant to a Mining Lease with Calista (“Calista Lease”) and a Surface Use Agreement (“SUA”) with TKC. The ability of Donlin Gold to continue to explore and develop the Donlin Gold project depends upon its continued compliance with the terms and conditions of the Calista Lease and SUA. Furthermore, our ability to continue to explore and develop other mineral properties may be subject to agreements with other third parties, including agreements with Native corporations, for instance.

Our largest shareholder has significant influence on us and may also affect the market price and liquidity of our securities.

Electrum Strategic Resources L.P. (“Electrum”) and its affiliate GRAT Holdings LLC hold in the aggregate 25.4% of our issued and outstanding common shares as of January 16, 2024. Accordingly, Electrum and its affiliates will have significant influence in determining the outcome of any corporate transaction or other matter submitted to the shareholders for approval, including mergers, consolidations, and the sale of all or substantially all of our assets and other significant corporate actions. Unless full participation of all shareholders takes place in such shareholder meetings, Electrum and its affiliates may be able to approve such matters itself. The concentration of ownership of the common shares by Electrum and its affiliates may: (i) delay or deter a change of control of the Company; (ii) deprive shareholders of an opportunity to receive a premium for their common shares as part of a sale of the Company; and (iii) affect the market price and liquidity of the common shares. In conjunction with the January 22, 2009 financing, we provided Electrum with the right to designate an observer at all meetings of the board of directors (the “Board”) and any committee thereof so long as Electrum and its affiliates hold not less than 15% of our common shares. In November 2011, Dr. Thomas S. Kaplan, was appointed Chairman of our Board. Dr. Kaplan is also the Chairman, Chief Executive Officer, and Chief Investment Officer of The Electrum Group LLC. Kaplan is also the Chairman and Chief Executive Officer of The Electrum Group LLC. As long as Electrum and its affiliates maintain its shareholdings in the Company, Electrum will have significant influence in determining the members of the Board. Without the consent of Electrum, we could be prevented from entering into transactions that are otherwise beneficial to us. The interests of Electrum and its affiliates may differ from or be adverse to the interests of our other shareholders. The effect of these rights and Electrum’s influence may impact the price that investors are willing to pay for our shares. If Electrum or its affiliates sell a substantial number of our common shares in the public market, the market price of the common shares could be adversely impacted. The perception among the public that these sales will occur could also contribute to a decline in the market price of our common shares.

Some of the directors and officers have conflicts of interest as a result of their involvement with other natural resource companies.

Certain of our directors and officers also serve as directors, or have significant shareholdings in, other companies involved in natural resource exploration and development or mining-related activities. To the extent that such other companies may participate in ventures in which we may participate in or in ventures which we may seek to participate in, the directors and officers may have a conflict of interest. In all cases where the directors or officers have an interest in other companies, such other companies may also compete with us for the acquisition of mineral property investments. Any decision made by any of these directors and officers involving the Company will be made in accordance with their duties and obligations to deal fairly and in good faith with a view to the best interests of the Company. In addition, each of the directors is required to declare and refrain from voting on any matter in which these directors may have a conflict of interest in accordance with the procedures set forth in the Business Corporations Act (British Columbia) and other applicable laws. In appropriate cases, the Company will establish a special committee of independent directors to review a matter in which several directors, or management, may have a conflict. Nonetheless, as a result of these conflicts of interest, the Company may not have an opportunity to participate in certain transactions, which may have a material adverse effect on the Company’s business, profitability, financial condition, results of operation, and prospects.

18

NOVAGOLD RESOURCES INC.

We have ongoing reclamation on some of our mineral properties and may be required to fund additional work that could have a material adverse effect on our financial position.

Land reclamation requirements are generally imposed on mineral exploration companies (as well as companies with mining operations) to minimize long term effects of land disturbance. Reclamation may include requirements to:

treat ground and surface water to applicable water standards;

control dispersion of potentially deleterious effluents;

reasonably re-establish pre-disturbance landforms and vegetation; and

provide adequate financial assurance to ensure required reclamation of land affected by our activities.

Exploration and other activities at the Donlin Gold project site have created disturbance that must be reclaimed. Financial resources spent on reclamation might otherwise be spent on further exploration and development programs. In addition, regulatory changes could increase our obligations to perform reclamation and mine closure activities. There can be no assurance that we will not be required to fund additional reclamation work at the site that could have a material adverse effect on our financial position.

We are exposed to credit, liquidity, and interest rate risk.

Credit risk is the risk of an unexpected loss if a customer or third party to a financial instrument fails to meet its contractual obligations. Our cash equivalents and term deposit investments are held through large Canadian chartered banks with high investment-grade ratings. These investments mature at various dates over the current operating period. A portion of the proceeds from the sale of our Galore Creek assets include notes receivable from a subsidiary of Newmont Corporation (“Newmont”), a publicly traded company with investment-grade credit ratings. The notes receivable included a $75 million note receivable of which payment was received on July 27, 2021 and included a $25 million note receivable of which payment was received on July 27, 2023. An additional $75 million will be receivable if and when a Galore Creek project construction plan is approved by the owner(s). The notes receivable included a $75 million note receivable of which payment was received on July 27, 2021 and includes a $25 million note receivable upon the earlier of the completion of a Galore Creek project feasibility study or July 27, 2023. An additional $75 million will be receivable if, and when a Galore Creek project construction plan is approved by the owner(s). No value was assigned to the final $75 million contingent note receivable due to the uncertainty with regards to the approval of a Galore Creek project construction plan. The carrying amount of financial assets recorded in the financial statements, net of any allowances for losses, represents our maximum exposure to credit risk.

Liquidity risk is the risk that we will not be able to meet our financial obligations as they come due. We manage liquidity risk through regular cash flow forecasts to assess our current and future financial position as well as maintaining a prudent capital structure. Accounts payable and accrued liabilities are due within one year from the balance sheet date.

Interest rate risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate because of changes in market interest rates. The risk that we will realize a loss as a result of a decline in the fair value of the term deposit investments is limited because these investments have an original term of less than one year and are generally held to maturity. The promissory note owed to Barrick is variable with the U.S. prime rate. Based on the amount owing on the promissory note as of November 30, 2023, and assuming all other variables remain constant, a 1% change in the U.S. prime rate would result in an increase/decrease of approximately $1.4 million in the interest accrued on the promissory note per annum. For more detail with respect to the promissory note, see section Item 2, Donlin Gold Project, Alaska, below.

Risks Related to Our Industry

Mining is inherently risky and subject to conditions or events some of which are beyond our control, and which could have a material adverse effect on our business.

Mining involves various types of risks, including:

environmental hazards;

industrial accidents;

metallurgical and other processing problems;

unusual or unexpected geologic formations and conditions;

structural cave-ins or slides;

flooding;

fires;

power outages;

labor disruptions;

explosions;

landslides and avalanches;

mechanical equipment and facility performance problems;

availability of materials and equipment;

metals losses; and

periodic interruptions due to inclement or hazardous weather conditions.

19

NOVAGOLD RESOURCES INC.

These risks could result in damage to, or destruction of, mineral properties, production facilities or other properties; personal injury or death, including to employees; environmental damage; delays in construction or mining operations; increased production costs; asset write downs; monetary losses; and possible legal liability. We may not be able to obtain insurance to cover these risks at economically feasible premiums or at all. Insurance against certain environmental risks, including potential liability for pollution or other hazards as a result of the disposal of waste products occurring from mineral production, is not generally available to us or to other companies within the mining industry. We may suffer a material adverse impact on our business if we incur losses related to any significant events that are not covered by our insurance policies.

Exploration, construction, and production activities may be limited or delayed by inclement weather and shortened exploration, construction and operating seasons. For example, Donlin Gold proposes to transport the bulk of the supplies required to operate the Donlin Gold project to the site from ports in the United States and Canada. This would require the supplies to be transported by barge on the Kuskokwim River which is free of ice and open for barge traffic for a limited period each year. Delays in the ice breakup or early freeze-up, low flow levels and water depths, or other conditions affecting the Kuskokwim River could delay or prevent Donlin Gold from transporting supplies to the site. Any such interference with the delivery of needed supplies to the Donlin Gold project could adversely affect the construction or operation of the project and/or the costs associated with these activities which, in turn, would adversely affect our business.

We are subject to significant governmental regulation.

Our operations, exploration and development activities in the United States, are subject to extensive federal, state and local laws and regulations governing various matters, including:

environmental protection;

management and use of toxic substances and explosives;

management of tailings and other wastes generated by our operations;

management of natural resources;

exploration and development of mines, production and post-closure reclamation;

exports;

price controls;

taxation and mining royalties;

regulations concerning business dealings with indigenous groups;

availability and use of water resources;

labor standards and occupational health and safety, including mine safety; and

preservation of historic and cultural resources.

Failure to comply with applicable laws and regulations may result in civil or criminal fines or penalties or enforcement actions, including orders issued by regulatory or judicial authorities enjoining, curtailing or closing operations or requiring corrective measures, installation of additional equipment or remedial actions, any of which could result in us incurring significant expenditures. We may also be required to compensate private parties suffering loss or damage by reason of a breach of such laws, regulations or permitting requirements. It is also possible that future laws and regulations, or a more stringent enforcement of current laws and regulations by governmental authorities, could cause additional expense, capital expenditures, restrictions on or suspensions of our operations and delays in the exploration and development of our mineral properties.

20

NOVAGOLD RESOURCES INC.

Our activities are subject to environmental laws and regulations that may increase our costs of doing business and restrict our operations.

Our exploration, potential development and production activities in the United States are subject to regulation by governmental agencies under various environmental laws. To the extent that we conduct exploration activities or undertake new mining activities in other foreign countries, we will also be subject to environmental laws and regulations in those jurisdictions. These laws address emissions into the air, discharges into water, management of waste, management of hazardous substances, use of water, protection of natural resources, antiquities and endangered species, and reclamation of lands disturbed by mining operations. Environmental legislation and regulations continue to evolve, and the trend has been toward stricter standards and enforcement, increased fines and penalties for non-compliance, more stringent environmental assessments of proposed projects and increasing responsibility for companies and their officers, directors and employees. Compliance with environmental laws and regulations may require significant capital outlays on our behalf and may cause material changes or delays in our intended activities. There can be no assurance that future changes in environmental regulations will not adversely affect our business, and it is possible that future changes in these laws or regulations could have a significant adverse impact on some portion of our business, causing us to re-evaluate those activities at that time.

Environmental hazards may exist on our mineral properties that are unknown to us at the present time, and that have been caused by previous owners or operators or that may have occurred naturally. We may be liable for remediating such damage.

Failure to comply with applicable environmental laws, regulations and permitting requirements may result in enforcement actions thereunder, including orders issued by regulatory or judicial authorities, causing operations to cease or to be curtailed, and may include corrective measures requiring capital expenditures, installation of additional equipment or remedial actions.

Our insurance will not cover all of the potential risks associated with mining operations.

Our business is subject to a number of risks and hazards generally including adverse environmental conditions, industrial accidents, labor disputes, unusual or unexpected geological conditions, ground or slope failures, cave-ins, changes in the regulatory environment and natural phenomena, such as inclement weather conditions, floods, hurricanes and earthquakes. Such occurrences could result in damage to mineral properties or production facilities, personal injury or death, environmental damage to our properties or the property of others, delays in construction or mining, monetary losses, and possible legal liability.

Although we maintain insurance to protect against certain risks in such amounts as we consider reasonable, our insurance will not cover all the potential risks associated with a mining company’s operations. We may also be unable to maintain insurance to cover these risks at economically feasible premiums. Insurance coverage may not continue to be available or may not be adequate to cover any resulting liability. Moreover, insurance against risks such as loss of title to mineral property, environmental pollution, or other hazards, as a result of exploration and production is not generally available to us or to other companies in the mining industry on acceptable terms. We might also become subject to liability for pollution or other hazards which may not be insured against or which we may elect not to insure against because of premium costs or other reasons. Losses from these events may cause us to incur significant costs that could have a material adverse effect on our financial performance and results of operations.

Title and other rights to our mineral properties cannot be guaranteed and may be subject to prior unregistered agreements, transfers or claims and other defects.

We cannot guarantee that title to our mineral properties will not be challenged. We may not have, or may not be able to obtain, all necessary surface rights to develop a mineral property. Title insurance is generally not available for mineral properties and our ability to ensure that we have obtained secure claim to individual mineral properties or mining concessions may be severely constrained. Our mineral properties may be subject to prior unregistered agreements, transfers or claims, and title may be affected by, among other things, undetected defects. We have not conducted surveys of all the mineral properties in which we hold direct or indirect interests. A successful challenge to the precise area and location of these mineral properties could result in us being unable to operate on our mineral properties as permitted or being unable to enforce our rights with respect to our mineral properties. This could result in us not being compensated for our prior investment relating to the mineral property.

Rising metal prices encourage mining exploration, development, and construction activity, which in the past has increased demand for and cost of contract mining services and equipment.

Increases in metal prices tend to encourage increases in mining exploration, development, and construction activities. During past expansions, demand for and the cost of contract exploration, development and construction services and equipment have increased as well. Increased demand for and cost of services and equipment could cause project costs to increase materially, resulting in delays if services or equipment cannot be obtained in a timely manner due to inadequate availability, and increased potential for scheduling difficulties and cost increases due to the need to coordinate the availability of services or equipment, any of which could materially increase project exploration, development, or construction costs, result in project delays, or both. There can be no assurance that increased costs may not adversely affect our development of our mineral properties in the future.

21

NOVAGOLD RESOURCES INC.

We may experience difficulty attracting and retaining qualified management and technical personnel to meet our business objectives, and the failure to manage our business effectively could have a material adverse effect on our business and financial condition.

We are dependent on the services of key executives including our President and Chief Executive Officer and other highly skilled and experienced executives and personnel focused on managing our interests and the advancement of the Donlin Gold project, in addition to the identification of new opportunities for growth and funding. Due to our relatively small size, the loss of these persons or our inability to attract and retain additional highly skilled employees required for the development of our activities may have a material adverse effect on our business or future operations.

We may be subject to legal proceedings.

Due to the nature of our business, we may be subject to a variety of regulatory investigations, claims, lawsuits, and other proceedings in the ordinary course of our business. The results of these legal proceedings cannot be predicted with certainty due to the uncertainty inherent in litigation, including the effects of discovery of new evidence or advancement of new legal theories, the difficulty of predicting decisions of judges and juries and the possibility that decisions may be reversed on appeal. There can be no assurances that these matters will not have a material adverse effect on our business.

General Risk Factors

Global climate change is an international concern and could impact our ability to conduct future operations.

Global climate change is an international issue and receives an enormous amount of publicity. We would expect that the imposition of international treaties or U.S. or Canadian federal, state, provincial, or local laws or regulations pertaining to mandatory reductions in energy consumption or emissions of greenhouse gasses could affect the feasibility of mining projects and increase operating costs.

The Donlin Gold project is not directly threatened by current predictions of sea level rise as it is located inland at elevations 150 meters to 640 meters above sea level. However, changes in sea levels could affect ocean and river transportation and shipping facilities, which would be used to transport supplies, equipment and personnel to the Donlin Gold project and products from the project to world markets. The Donlin Gold project proposes to deliver the vast majority of construction and operations equipment, supplies, consumables, and other required materials to the project site via the Kuskokwim River when it is ice-free. Historically, the Kuskokwim River has been ice-free from late April until mid-October and models based on historic weather and river flow records predict that there would be sufficient flow in the river to allow the transportation of the required materials to the project site annually. If climate changes alter the ice-free season or flow patterns of the Kuskokwim River, the current supply logistics plan for the project may need to be modified.

Climate changes also could affect the availability of water required to sustain operations at the Donlin Gold project. Also, management of water is an essential component of the project’s operating plans. Climate change could require modifications to the project’s water management plan, which may require additional capital investments or increase operating costs, if precipitation increases or decreases relative to historic records.

Extreme weather events (such as increased frequency or intensity of storms, increased snowpack, prolonged drought, and associated fire danger) have the potential to disrupt operations. Where appropriate the Donlin Gold project has developed contingency plans for managing extreme weather conditions; however, extended disruptions to supply lines due to extreme weather could result in interruption of activities at the project site, delay or increase the cost of construction of the project, or otherwise adversely affect our business.

22

NOVAGOLD RESOURCES INC.

The Company is dependent upon information technology systems, which are subject to disruption, damage, failure, and risks associated with implementation and integration.

The Company’s information technology systems used in its operations are subject to disruption, damage, or failure from a variety of sources, including, without limitation, computer viruses, security breaches, cyberattacks, natural disasters and defects in design. Cybersecurity incidents are evolving and include, but are not limited to, malicious software, attempts to gain unauthorized access to data or machines and equipment, and other electronic security breaches that could lead to disruptions in systems, unauthorized release of confidential or otherwise protected information, the corruption of data or the disabling, misuse or malfunction of machines and equipment. Various measures have been implemented to manage the Company’s risks related to information technology systems and network disruptions. However, given the unpredictability of the timing, nature and scope of information or operational technology disruptions, the Company could potentially be subject to the compromising of confidential or otherwise protected information, destruction or corruption of data, security breaches, other manipulation or improper use of our systems and networks or financial losses from remedial actions, any of which could have a material adverse effect on cash flows, financial condition or results of operations.

The Company could also be adversely affected by system or network disruptions if new or upgraded information technology systems are defective, not installed properly or not properly integrated into operations. Various measures have been implemented to manage the risks related to the system implementation and modification, but system modification failures could have a material adverse effect on the Company’s business, financial position, and results of operations.

We believe we were a passive foreign investment company (PFIC) in 2023 which could have negative tax consequences for U.S. investors.

U.S. holders of our common shares should be aware that we believe that for U.S. federal income tax purposes we were classified as a PFIC for our fiscal year ended November 30, 2023, and that we may continue to be classified as a PFIC in future years. The determination of whether the Company is a PFIC is a factual determination dependent on a number of factors and cannot be made until the close of the applicable tax year. Accordingly, no assurances can be given regarding the Company’s PFIC status for the current year or any future year. If the Company is a PFIC at any time during a U.S. holder’s holding period, then certain potentially adverse tax consequences could apply to such U.S. holder’s acquisition, ownership, and disposition of common shares. For more information, please see the discussion in Item 5. Market for Registrants Common Equity, Related Shareholder Matters and Issuer Purchases of Equity Securities Certain U.S. Federal Income Tax Considerations for U.S. Holders” below.

Item 1B.

Unresolved Staff Comments

None.

Item 1C.

Cybersecurity

Not applicable.

23

NOVAGOLD RESOURCES INC.

Recently Filed
Click on a ticker to see risk factors
Ticker * File Date
RBTK 6 days, 13 hours ago
BTTR 6 days, 13 hours ago
ROYL 6 days, 14 hours ago
VIRC 6 days, 14 hours ago
SCS 6 days, 14 hours ago
DHAC 6 days, 17 hours ago
ALOT 6 days, 19 hours ago
NUBI 6 days, 21 hours ago
TMTC 1 week ago
FDIT 1 week ago
INTE 1 week ago
IMHC 1 week ago
ADRT 1 week ago
QLIS 1 week ago
IVCB 1 week ago
NXPL 1 week ago
USCT 1 week ago
VBLT 1 week ago
BWV 1 week ago
BOTH 1 week ago
MTAC 1 week ago
TLYS 1 week ago
CNFN 1 week ago
RENT 1 week ago
AGX 1 week ago
LOVE 1 week ago
ASFT 1 week ago
CREG 1 week ago
LAKE 1 week, 1 day ago
RXMD 1 week, 1 day ago
ASPI 1 week, 1 day ago
SRZN 1 week, 1 day ago
PIK 1 week, 1 day ago
CANN 1 week, 1 day ago
BDPT 1 week, 1 day ago
BFI 1 week, 1 day ago
NXGL 1 week, 2 days ago
GREE 1 week, 2 days ago
SQL 1 week, 2 days ago
KITT 1 week, 2 days ago
INFU 1 week, 2 days ago
RSTN 1 week, 2 days ago
DKDCA 1 week, 2 days ago
BUUZ 1 week, 2 days ago
QSEP 1 week, 2 days ago
GNUS 1 week, 2 days ago
AURC 1 week, 3 days ago
IHT 1 week, 3 days ago
QIND 1 week, 3 days ago
QLGN 1 week, 6 days ago

OTHER DATASETS

House Trading

Dashboard

Corporate Flights

Dashboard

App Ratings

Dashboard